===========
These designs were worked on in from 18-31 July, mosly around July 28th. The first priority was the kitchen where the refrigerator was placed so as to take up and block most of the standing room. I moved it into a corner next to the stove, purchasing a heat block. Then I built shelving along the freed up back wall.
Next job was stripping molding and painting the main room, with designs for a couch and table as well as designs for a possible desk or table by the front window.
Last were initial plans for the sleeping alcove aka bedroom. There was space for a queen size or double bed/mattress but this would block the "closet" and would require crawling into bed from the foot. In the end, only a twin was feasible.